| DAY
ONE: First module already on user's foundation is about to be joined
by second module hanging from crane. |
Haz-Safe installation
crew is tightening up 1" nuts on ends of rods within patented
bolt-up tubes under sump floor. |
"Fifth"
air lock module is being craned into position where blue shrink
wrap is removed on second module. |